Workflow Upgrade 4.6C to ECC6 - manual settings during Cutover & Version

Sheldon Oxenberg soxenber at csc.com
Tue Nov 2 07:21:09 EDT 2010


Upgrading SAP Business Workflow from SAP R/3 4.6C to SAP ERP 6.0
This document describes the upgrade and the new workflow features since R/3
4.6c including the Universal Worklist.

http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/103b1a61-294f-2a10-6491-9827479d0bf1
https://cw.sdn.sap.com/cw/.../UpgradeWorkflow46cToSAP60.pdf


Thank you.

SHELDON OXENBERG
System Architect Principal Leader
LMP Technical Architect, SAP Workflow
CSC



                                                                                                                       
  From:       Sandy <sandysydney at gmail.com>                                                                            
                                                                                                                       
  To:         sap-wug at mit.edu                                                                                          
                                                                                                                       
  Date:       11/01/2010 08:20 PM                                                                                      
                                                                                                                       
  Subject:    Workflow Upgrade 4.6C to ECC6 - manual settings during Cutover &	Version                                
                                                                                                                       





Hello Guys,

We are upgrading to ECC 6 from 4.6C and we are on release 701 & support
pack SAPKB70106.

I would like to know which are the "Manual activities" that needs to done
during cutover and WHEN should these should be done (eg. before ECC6
upgade, or after ECC6 upgrade but before config/dev transports, or after
config/dev transports).

I have looked on few threads and found the following info. Please correct
me or add extra info if i have missed something:

1. Configure RFC destination & other mandatory options in Transaction SWU3.
2. Run Transaction SWU_OBUF to clear the runtime buffers before users start
Testing.

I assume rest of changes would be imported with transports, but i have read
through lot of SDN threads that all custom Workflow definitions needs to be
ACTIVATED in each system (DEV - QAS- PRD) and custom BOR objects needs be
REGENERATED in each system (DEV - QAS- PRD). Also, do I have manually set
the agent assignement for Customer Task as GENERAL TASK in each system? Are
above stated 3 steps needs to be manually done in each system or transports
take care of them ? I am bit confused. Could anybody please advise me
regarding the Manual Task/activities that needs to done in each system
during cutover during WF upgrade from 4.6 C to ECC6.

Thanks for posting excellent stuff regarding the Workflow Upgrades on this
mailing list. It really helped me in resolving most of my issues.

Thanks in advance

Kind Regards



Regards

Sandy


_______________________________________________
SAP-WUG mailing list
SAP-WUG at mit.edu
http://mailman.mit.edu/mailman/listinfo/sap-wug







More information about the SAP-WUG mailing list