requested start date error

Claude Bourque cbourque at bank-banque-canada.ca
Thu Jan 8 08:54:18 EST 2009


Björn,
 
I had the same problem several years ago in one system at a client site. I used transaction CUNI to fix it. I essentially copied the entries from another system for the missing time unit. Select Time as the Unit of Measurement.
 
 
 
Hope that helps.
 
Claude
-----Original Message-----
From: sap-wug-bounces at mit.edu [mailto:sap-wug-bounces at mit.edu] On Behalf Of Bjorn Demol
Sent: January 08, 2009 8:41 AM
To: SAP Workflow Users' Group
Subject: requested start date error 



Hi all,

I'm having troubles setting up a requested start date on a workflow step. The system gives me error 'No unit with the desired conversion factor is maintained'.

When I have a look on the workflow customizing, the time units have the error-status.

This problem only occurs on one client (unfortunately, this is the development-client.). 

I'm not very familiar with the time unit-settings. Does anyone have a clue on this ?

Thanks in advance !!

met vriendelijke groeten

Björn Demol

Technical Consultant
Woluwedal 30

1932 Zaventem

 

Tel: +32 (0)2 721 73 75

Fax: +32 (0)2 721 73 77 

GSM: +32 (0)495 35 16 25

Email: bjorn.demol at oasisconsultants.com <mailto:bjorn.demol at oasisconsultants.com> 
www.oasisconsultants.com <http://www.oasisconsultants.com/> 

 

====================================================================================

La version française suit le texte anglais.

------------------------------------------------------------------------------------

This email may contain privileged and/or confidential information, and the Bank of
Canada does not waive any related rights. Any distribution, use, or copying of this
email or the information it contains by other than the intended recipient is
unauthorized. If you received this email in error please delete it immediately from
your system and notify the sender promptly by email that you have done so. 

------------------------------------------------------------------------------------

Le présent courriel peut contenir de l'information privilégiée ou confidentielle.
La Banque du Canada ne renonce pas aux droits qui s'y rapportent. Toute diffusion,
utilisation ou copie de ce courriel ou des renseignements qu'il contient par une
personne autre que le ou les destinataires désignés est interdite. Si vous recevez
ce courriel par erreur, veuillez le supprimer immédiatement et envoyer sans délai à
l'expéditeur un message électronique pour l'aviser que vous avez éliminé de votre
ordinateur toute copie du courriel reçu.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20090108/08ab58ca/attachment.htm
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/bmp
Size: 42134 bytes
Desc: Outlook.bmp
Url : http://mailman.mit.edu/pipermail/sap-wug/attachments/20090108/08ab58ca/attachment.bin


More information about the SAP-WUG mailing list