Hi Swaminathan,
I think you should look to the settimgs of the WF-Deadline-Monitoring =
Job.
It is set standard for 10 min repeats.
This Job is responsible for the deadline-monitoring.
So it run only in 10 min period, your shortest time is 10 min.
Hope this helps
Greetings
Heinz
-----Urspr=FCngliche Nachricht-----
Von: Balasubramaniam, Swaminathan [mailto:SBalasubramaniam at medrad.com]
Gesendet am: Dienstag, 20. Mai 2003 15:02
An: SAP-WUG at MITVMA.MIT.EDU
Betreff: Workitem requested start
All,
I have a step that has a requested start of nine minutes after the Work =
item
is created. However, the actual start is always 10 minutes. When I look =
in
the log, it says requested start is 9 minutes after the work item =
creation
time but the actual start is 10 minutes after the creation time. Is 10
minutes the minimum delay I can have or am I doing anything wrong. I am =
on a
46B system.
Thanks
Swami