[Olympus] Crane Activities during DORIS Shutdown
Uwe Schneekloth
uwe.schneekloth at desy.de
Thu Jul 7 03:41:56 EDT 2011
Dear Colleagues,
As you know, the DORIS shutdown is going to start on Monday, We will try to roll-in
the detector on Friday, although this is very tight. The time consuming item is
the removal of the concrete shielding, which will be significantly faster if the
concrete can be moved above the detector and electronics hut.
This however means that entry to the detector area and the electronics hut
WILL BE BLOCKED during the crane activities Monday to Wednesday. The
crane people are going to work from 7am to about 6pm. During breaks and
in the evening access will of course be possible.
Best regards,
Uwe
_____________________________________________________
|
| Dr. Uwe Schneekloth
| OLYMPUS
| Deutsches Elektronensynchrotron
| Notkestrasse 85
| D-22603 Hamburg/Germany
| Tel: +49-40-8998 2007 Fax: +49-40-8998 3092
| email: uwe.schneekloth at desy.de
_____________________________________________________
More information about the Olympus
mailing list