[Tang-Residents] Emergency water shutdown Tomorrow 1/16/19
Michael J Collins
collinsm at mit.edu
Tue Jan 15 10:03:17 EST 2019
EMERGENCY
W84 WATER SHUTDOWN
HOT & COLD WATER SHUTDOWN
ALL D Kitchens
ALL E Kitchens and Bathrooms
WEDNESDAY 1/16/19
Please plan accordingly
Building Tang Hall
Date 1/16/19
Day: WEDNESDAY
Time:8:30AM TO 2PM
System: All domestic water (hot and cold)
Area effected: D and E SUITES
Repair Leak behind stove in 6D and 5D
We are hoping to have the repairs completed within 5 to 6 hours
Effect:
Loss of hot and cold domestic water. This means that no bathrooms,
Showers, kitchens and drinking fountains will be operational during
this shutdown.
We apologize for the inconvenience
Manager
Michael Collins
Manager
Tang Residence Hall
Westgate Apartments
Massachusetts Institute of Technology
Housing Department
W84-104 617-253-5146
collinsm at mit.edu
Michael Collins
House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
550 Memorial Drive
Westgate Family Apartments
540 Memorial Drive
Cambridge Ma 02139
Office Tele. 617-253-5146
http://tang.mit.edu/
http://westgate.mit.edu/
Repairs: - https://atlas.mit.edu/atlas/Main.action?tab=home&sub=group_servreq
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/tang-residents/attachments/20190115/6cbda29a/attachment.html
More information about the Tang-Residents
mailing list