Hi Rina,
When  WF-BATCH is Locked It Cause all the background tasks to be in status
READY.
I encountered the problem only in one task ( We Have A Lot Of background
tasks in the system )
I also checked in ST22 And Nothing
Kind Regards
Eliyahou Levy


 בתאריך 24 באפריל 2012 07:53, מאת אליהו לוי <eliyahou.levy at gmail.com>:

> HI,
> Thank you very much.
> Eliyahou Levy
>
> בתאריך 24 באפריל 2012 05:38, מאת Rina Spector <rina.spector at gmail.com>:
>
>>  Hi  Eliyahou ,
>> The  ready  is because  either   WF-BATCH is  Locked
>> ,Rfc    imporoper   or any  other  Problem  reported in SWU3,  ALso
>> triggering and terminating events are not deliverd so check  also  there
>>  for the Error message ,.
>>
>>  Good Luck with  the  Enhancement  Pack   !!!
>> Rina  Spector
>>
>>
>>  On Mon, Apr 23, 2012 at 9:39 AM, אליהו לוי <eliyahou.levy at gmail.com>wrote:
>>
>>>   בס"ד
>>>
>>> Hi All,
>>> I have a background task that is in status 'READY' as if it waits to be
>>> approved by agent
>>> What Cause a background task to act as a one that should be approved by
>>> agent
>>> and how can i Fix it so it won't happen again
>>> Thanks all
>>>
>>> --
>>>
>>>  Kind regards
>>> Eliyahou Levy
>>>
>>>
>>>
>>> _______________________________________________
>>> SAP-WUG mailing list
>>> SAP-WUG at mit.edu
>>> http://mailman.mit.edu/mailman/listinfo/sap-wug
>>>
>>>
>>
>> _______________________________________________
>> SAP-WUG mailing list
>> SAP-WUG at mit.edu
>> http://mailman.mit.edu/mailman/listinfo/sap-wug
>>
>>
>
>
> --
>
>  Kind regards
> Eliyahou Levy
>
>
>

-- 

 Kind regards
Eliyahou Levy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20120424/884f4912/attachment.htm


More information about the SAP-WUG mailing list