Requisitioner’s approval level is higher than the PR value
gopinath srikakulam
srikagop at gmail.com
Fri Aug 6 08:02:09 EDT 2010
Hi Experts,
I am having one scenario...
If the Requisitioner’s approval level is higher than the PR value, then a
background release is performed. If Requisitioner’s approval level is lower
than the PR value, then the PR is routed for approval, and email(s) is/are
sent to the approver(s), and to their SAP Inbox for workflow approval.
How can i achieve this plz provide the steps...
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20100806/5aee9223/attachment.htm
More information about the SAP-WUG
mailing list