Binding issues after transport to production
    Carolyn Fuller 
    fuller at MIT.EDU
       
    Thu Feb 12 12:01:27 EST 2009
    
    
  
Jocelyn,
> But I think the main thing you need to check is that the XML container
> approach is being used equally across all environments - it's possible
> the setting was changed in the workflow admin in your DEV and QA
> environments but not production and that could create ongoing  
> problems.
The Persistence Profile is set to Compatibility mode in DEV, QA and  
Production for the problem workflow template. This setting corresponds  
to the setting Structure persistence. If we convert to XML Persistence  
I'm assuming a lot of custom code will need to be modified.
I can see doing this on an " as needed" basis but I will need to build  
a persuasive business case to convert all our existing workflow  
templates to XML Persistence.
Boy, the enhancement due into production before the end of this month  
just got a whole lot bigger!
---
Carolyn Fuller
Massachusetts Institute of Technology
Information Services and Technology
Administrative Computing
Senior Analyst/ Programmer
(617) 253-6213
http://fuller.mit.edu/
    
    
More information about the SAP-WUG
mailing list