Problem with deadline monitoring

Ibrahim Khan ikhansap at gmail.com
Thu Jul 3 10:47:17 EDT 2008


 have to use different deadline for different approvers.
I am using a expression in deadline monitoring and calculating the
deadline date and time every time inside the loop(before the approval
step).For the first time it is taking the correct date and time(i mean the
value from the WF container element which is specified in the expression)
but for the second time(after looping) it is not taking the value in the WF
container element(wf contanier elements correctly populated), instead it is
taking the current system date and time, i was wondering what could be the
issue?

Finally I found the problem. Since for some approver there is no time limit,
i have set the dead line date(in my variable used in expression) as
31.12.9999, but the system is not taking this date instead taking the
current system date and time. If it set the date as 30.12.9999 it is working
fine. I don't know why, experts please advice.
Or should i use 2 different task one with deadline monitoring and one
without deadline...
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20080703/2f820a67/attachment.htm


More information about the SAP-WUG mailing list