Workflow between different R/3-Systems
Brilleman JOHANNES (Hans)
JOHANNES.Brilleman at petrosa.co.za
Mon Sep 13 10:51:07 EDT 2004
=20 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D =
=20 =20
=20 Notice of Disclaimer: Please note that this e-mail, and the con=
tents thereof,=20
=20 is subject to the Standard PetroSA e-mail Disclaimer which is =
located at=20
=20 http://www.petrosa.co.za/disclaimer.htm
=20 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Hi,
I have played around with the standard transport workflow and it seems it=
=20would pretty much cater for Ute's needs, but now I have a question of =
my own - how do you switch it off when needed. I have de-actived the even=
t linkages, tried everything, but for the life of me it just keeps on wo=
rking like a steam locomotive ( I know you are going to say "switch it of=
f the way you switched it on.....but don't ask.....)
Regards,
Hans
-----Original Message-----
From: SAP Workflow [mailto:Owner-SAP-WUG at MITVMA.MIT.EDU] On Behalf Of Dar=
t, Jocelyn
Sent: 13 September 2004 03:26 PM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: Re: Workflow between different R/3-Systems
Ute,=20
Have you looked at the standard transport management workflow?=20
Regards,
Jocelyn =20
-----Original Message-----
From: SAP Workflow [mailto:Owner-SAP-WUG at MITVMA.MIT.EDU]=20
Sent: Monday,13 September 2004 10:08 PM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: Workflow between different R/3-Systems
Hi everybody,
I received a request and would like your opinion on this.
The Process is to take place on an SEM-system.
Data is to be entered into the Developmet System,
then the Controlling takes a look at the data,
after the approval is granted,
there has to be a synchronization
after that transport to qa-system=20
a second synchronizaton in the QA-system,
the data has to be checked=20
if the check was ok,=20
transport to productiv system
final synchronization
Is it possible to build such a workflow ?
I=B4m looking forward to any answer.
Thanx for your help
Ute
=20 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
=20 The Petroleum Oil & Gas Corporation of South Afri=
ca (Pty) Ltd=20
=20 trading as "PetroSA" Reg. No. 1970/008130/=
07.=20
=20 Directors:
=20 =20
=20 Dr P S Molefe (Chairman)
=20 =20
=20 Mr S Mkhize (Managing Director and Chief Executive =
Officer),
=20 Mr N G Nika (Executive), Mr A R Nkuhlu, Ms R J Huntley, =
Ms T C P Chikane,
=20 Dr M S Mzimba, Mr N H Gumede, Prof. B Fi=
gaji,
=20 Mr A W. Mjekula, Ms P P J Molefe, Mr T O M=
okwena
=20 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
More information about the SAP-WUG
mailing list