Workitem requested start

Balasubramaniam, Swaminathan SBalasubramaniam at medrad.com
Tue May 20 09:15:06 EDT 2003


Heinz,
If you are talking about RSWWDHEX scheduling, we have it scheduled once =
in 2
hrs. So 10 minutes should also not be a factor right?
 
Swami
 
-----Original Message-----
From: Schmidinger, Heinz (Unaxis IT BZ)
[mailto:heinz.schmidinger at unaxis.com]
Sent: Tuesday, May 20, 2003 9:09 AM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: AW: Workitem requested start
 
 
Hi Swaminathan,
 
I think you should look to the settimgs of the WF-Deadline-Monitoring =
Job.
It is set standard for 10 min repeats.
This Job is responsible for the deadline-monitoring.
So it run only in 10 min period, your shortest time is 10 min.
 
Hope this helps
 
Greetings
 
Heinz
 
-----Urspr=FCngliche Nachricht-----
Von: Balasubramaniam, Swaminathan [mailto:SBalasubramaniam at medrad.com]
Gesendet am: Dienstag, 20. Mai 2003 15:02
An: SAP-WUG at MITVMA.MIT.EDU
Betreff: Workitem requested start
 
All,
I have a step that has a requested start of nine minutes after the Work =
item
is created. However, the actual start is always 10 minutes. When I look =
in
the log, it says requested start is 9 minutes after the work item =
creation
time but the actual start is 10 minutes after the creation time. Is 10
minutes the minimum delay I can have or am I doing anything wrong. I am =
on a
46B system.
 
 
Thanks
Swami
 


More information about the SAP-WUG mailing list