Bus1001006, Two Tasks created.

Balasubramaniam, Swaminathan SBalasubramaniam at medrad.com
Wed Jun 18 18:23:37 EDT 2003


Ken,
Did you check the change object in SWEC. I had the same problem. Prior to
3.1I, SWEC was the only way to trigger a material master event. In 46b,SAP
triggered it using the function module. Please take a look,
 
Swami
 
-----Original Message-----
From: Ken Susen [mailto:Ken.Susen at usa.contiteves.com]
Sent: Wednesday, June 18, 2003 9:38 AM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: Bus1001006, Two Tasks created.
 
 
Hello Everyone,
 
I have a workflow designed in 46C that starts two instances of tasks when
triggered.
 
It has only one entry in "event type linkage", SWETYPV. Activated is
checked, a
receiver function module SWW_WI_CREATE_VIA_EVENT and a custom receiver type
FM
Z_MM_WF_GET_RECEIVER_TYPE are entered into the linkages.
 
The results is two identical tasks are created with different work item
numbers.
 
Regards,
Ken
 
*******************************************
Kenneth Susen
Continental-Teves, Inc.
NA SAP Production Planning
400 Ridgefield Court
Asheville, NC  28806
(828) 665-6229 office
(828) 781-3544 mobile
Ken.Susen at usa.contiteves.com
********************************************
 


More information about the SAP-WUG mailing list