Please disregard this message. This is no longer a problem.
Thanks
> -----Original Message-----
>> From: Benson, Darlene
> Sent: Monday, June 25, 2001 4:08 PM
> To: SAP-WUG at MITVMA.MIT.EDU
> Subject: Single-step task in background 4.0B
>
> Hi everyone,
>
> I have created a single-step task so that I can access a particular object
> method that I have created. When the event is raised the task is getting
> created correctly. When the method is dialog and synchronous an
> executable work item is created. When I execute the work item the method
> runs and the desired result occurs. However, I need the task to run in
> background when the event is raised. So I took off the dialog option on
> the method and made the task a background task. Now when the task runs a
> work item type B is created instead of W. When I go to the list of work
> items (SWI1) I can see that the item is in status completed but the
> desired result does not occur. I tried testing the method directly from
> the BOR and the desired result occurs then, so I am not sure why it does
> not occur when run in background. Any suggestions on what may be causing
> this problem are welcome.
>
> Darlene