Dear Colleagues, 

Attached is a draft version of the new schedule to be presented in the collaboration
meeting. 

Please note, that the summer shutdown, when the detector will be moved into the beam 
position, is quite short. This means that all detector components, except the Moller 
lumi system, have to be installed, connected and checked out when the detector is still
in the parking position. 

Please let me know if you have comments, in particular on the schedule of the 
detector components. I haven't talked to everybody. Some dates are best guesses.

Best regards,
Uwe


-------------- next part --------------
A non-text attachment was scrubbed...
Name: OLYMPUS_11.pdf
Type: application/pdf
Size: 40749 bytes
Desc: not available
Url : http://mailman.mit.edu/pipermail/olympus/attachments/20110419/c30fb7c9/OLYMPUS_11.pdf
-------------- next part --------------


_____________________________________________________
|                                        
| Dr. Uwe Schneekloth   
| OLYMPUS                                           
| Deutsches Elektronensynchrotron  
| Notkestrasse 85                                     
| D-22603 Hamburg/Germany              
| Tel: +49-40-8998 2007  Fax: +49-40-8998 3092 
| email: uwe.schneekloth at desy.de                          
_____________________________________________________




More information about the Olympus mailing list