[Tang-Residents] Emergency Water shut down to all D and E suites WEDNESDAY 9am to 3pm

Michael J Collins collinsm at mit.edu
Mon Nov 17 13:55:47 EST 2025


EMERGENCY

W84 WATER SHUTDOWN

WEDNESDAY 11/19

ALL D AND E SUITES



Building  Tang Hall

Date: NOV 19TH

Day: WEDNESDAY

9 am to 3 noon

System: All domestic water (hot and cold)



THIS SHUT DOWN IS TO REPAIR THE LEAK IN THE REAR LOBBY

Contractors will be working behind the stove in 21D to make the repair

We are hoping to have the repairs completed BY 3PM



Effect:

  Loss of hot and cold domestic water. This means that no bathrooms,

  Showers, kitchens and drinking fountains will be operational during

  this shutdown.



Warning:

To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown.  If you try a faucet and find the water is still off, turn the faucet back off.



Please plan accordingly

I apologize for the inconvenience



Manager

Michael Collins

Manager

Tang Residence Hall

Westgate Apartments

Massachusetts Institute of Technology

Housing Department

W84-104 617-253-5146

collinsm at mit.edu


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20251117/6e659a4a/attachment.htm>


More information about the Tang-Residents mailing list