[Tang-Residents] Water Shut down Wednesday 2/5/25
Michael J Collins
collinsm at mit.edu
Fri Jan 31 11:49:20 EST 2025
W84 WATER SHUTDOWN
WEDNESDAY 2/5/25
ENTIRE BUILDING
Building Tang Hall
Date: FEBRUARY 5TH
Day: WEDNESDAY
9 am to 4pm
System: All domestic water (hot and cold)
This Facilities shutdown is to change a 6 inch line in the basement mechanical space that is leaking.
Also to install new shut off valves under the bathroom vanity in 20B bathroom.
We are hoping to have the repairs completed within 5 to 6 hours. Residents will be updated
Effect:
Loss of hot and cold domestic water. This means that no bathrooms,
Showers, kitchens and drinking fountains will be operational during
this shutdown.
Warning:
To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown. If you try a faucet and find the water is still off, turn the faucet back off.
Please plan accordingly
I apologize for the inconvenience
Manager
Michael Collins
Michael Collins
House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20250131/bd64385f/attachment.htm>
More information about the Tang-Residents
mailing list