[Tang-Residents] Water Shut down Wednesday 1/29/25
Michael J Collins
collinsm at mit.edu
Fri Jan 24 07:46:09 EST 2025
W84 WATER SHUTDOWN
WEDNESDAY 1/29/25
ALL A AND B SUITES
Building Tang Hall
Date: JANUARY 29TH
Day: WEDNESDAY
9 am to 2 pm
System: All domestic water (hot and cold)
This shutdown is to install new shut off valves under the bathroom vanity and also to install a new mixing Valve in the shower in 20B bathroom.
We are hoping to have the repairs completed within 3 to 5 hours
Effect:
Loss of hot and cold domestic water. This means that no bathrooms,
Showers, kitchens and drinking fountains will be operational during
this shutdown.
Warning:
To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown. If you try a faucet and find the water is still off, turn the faucet back off.
Please plan accordingly
I apologize for the inconvenience
Manager
Michael Collins
Michael Collins
House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20250124/d1511040/attachment.htm>
More information about the Tang-Residents
mailing list