[Tang-Residents] W84 WATER SHUTDOWN

Michael J Collins collinsm at mit.edu
Tue Jan 21 08:25:21 EST 2025


A GENTLE REMINDER FOR TODAY

From: Michael J Collins
Sent: Thursday, January 16, 2025 1:27 PM
To: tang-residents <tang-residents at mit.edu>
Subject: W84 WATER SHUTDOWN
Importance: High


W84 WATER SHUTDOWN

TUESDAY 1/21/25

ALL A AND B SUITES



Building  Tang Hall

Date: JANUARY 21ST

Day: TUESDAY

9 am to 2 pm

System: All domestic water (hot and cold)



This shutdown is to install ne shut off valves under the bathroom vanity and also to install a new mixing Valve in the shower in 14B bathroom.

We are hoping to have the repairs completed within 3 to 5 hours



Effect:

Loss of hot and cold domestic water. This means that no bathrooms,

Showers, kitchens and drinking fountains will be operational during

this shutdown.



Warning:

To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown.  If you try a faucet and find the water is still off, turn the faucet back off.



Please plan accordingly

I apologize for the inconvenience

Manager

Michael Collins




Michael Collins
House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
Tang Hall - The high rise beside the river! (mit.edu)<https://tang.mit.edu/>

550 Memorial Drive
Westgate Family Apartments
News & Upcoming Events - Westgate (mit.edu)<https://westgate.scripts.mit.edu/main/home/>
540 Memorial Drive
Cambridge Ma 02139
Office Tele. 617-253-5146


ATLAS - Navigating Your MIT World<https://atlas.mit.edu/atlas/Main.action?tab=home&sapSystemId=PS1>


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20250121/4f22cb14/attachment.htm>


More information about the Tang-Residents mailing list