[Tang-Residents] W84 water shut down Tuesday 7/2 for A and F suites only

Michael J Collins collinsm at mit.edu
Mon Jul 1 09:53:07 EDT 2024


PLEASE BE AWARE
THIS HAS NOW BEEN RESCHEDULED FOR TOMORROW.    7/2/24



On Jun 24, 2024, at 6:50 AM, Michael J Collins <collinsm at mit.edu> wrote:






SCHEDULED

W84 WATER SHUTDOWN WEDNESDAY 6/26

ALL A and F SUITES ONLY



Building  Tang Hall

Date: June 26th

Day: Wednesday

9 am to 2 pm

System: All domestic water (hot and cold)

THIS SHUT DOWN IS TO REPAIR THE LEAK IN THE 1st FLOOR LOUNGE BEHIND THE BATHROOM WALL IN SUITE 2A PLEASE PLAN ACCORDINGLY





We are hoping to have the repairs completed within 3 to 4 hours. Once repairs  completed, you will be notified



Effect:

  Loss of hot and cold domestic water. This means that no bathrooms,

  Showers, kitchens and drinking fountains will be operational during

  this shutdown.



Warning:

To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown.  If you try a faucet and find the water is still off, turn the faucet back off.



AGAIN Please plan accordingly.

We apologize for the inconvenience

Michael Collins

House Operations Manager

Tang Residence Hall

Westgate Apartments

Massachusetts Institute of Technology

Housing Department

W84-104 617-253-5146

collinsm at mit.edu

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20240701/7e2e8a31/attachment.htm>


More information about the Tang-Residents mailing list