[Tang-Residents] FW: Bldgs. W71/W84/W85 Steam, Building Heat, and Domestic Hot Water Shutdown (#24069)

Michael J Collins collinsm at mit.edu
Mon Aug 5 07:10:17 EDT 2024



Please see the how water shut down scheduled for this Thursday 8/8/24


Subject: Bldgs. W71/W84/W85 Steam, Building Heat, and Domestic Hot Water Shutdown (#24069)
Importance: High


Type: Normal
Date: August 8, 2024
Day: Thursday
Time: 9:00 AM-2:00 PM
Building(s): W71, W84, and W85
Room(s): All
System: Domestic Hot Water, Heating Hot Water, High Pressure Steam, Medium Pressure Steam, Low Pressure Steam
Duration: 5 hrs.
Reason:
Repair Steam line anchor in MH 1021

Effect:
Domestic Hot Water, Heating Hot Water, High Pressure Steam, Medium Pressure Steam, Low Pressure Steam
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20240805/01b3e1ad/attachment.htm>


More information about the Tang-Residents mailing list