[Tang-Residents] Tang water shutdown

Michael J Collins collinsm at mit.edu
Tue Nov 7 16:29:53 EST 2023


EMERGENCY

W84 WATER SHUTDOWN

TOMORROW 11/8/23

ALL C AND D SUITES



Building  Tang Hall

Date: Nov 8th

Day: Wednesday

9 am to 3pm

System: All domestic water (hot and cold)

THIS SHUT DOWN IS TO REPAIR THE LEAK BEHIND THE WALL IN 12D



We are hoping to have the repairs completed within 5 to 6 hours



Effect:

  Loss of hot and cold domestic water. This means that no bathrooms,

  Showers, kitchens and drinking fountains will be operational during

  this shutdown.



Warning:

To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown.  If you try a faucet and find the water is still off, turn the faucet back off.



Please plan accordingly

I apologize for the inconvenience

Manager

Michael Collins

Manager

Tang Residence Hall

Westgate Apartments

Massachusetts Institute of Technology

Housing Department

W84-104 617-253-5146

collinsm at mit.edu

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20231107/1de370e0/attachment.htm>


More information about the Tang-Residents mailing list