W84 WATER SHUTDOWN

ALL HOT & COLD-WATER SHUTDOWN

THURSDAY 10/20/2022

ALL SUITES C AND D ONLY





Building  Tang Hall

Date  10/20/2022

Day: Thursday

9 am to 3pm

System: All domestic water (hot and cold)



Plumbers will be repairing the main drain behind the bathroom wall in 11D



We will be visiting all C and D suites at 9:am to flush all toilets and shut off water.



We are hoping to have all the repairs completed before 3pm



We apologize for the inconvenience and appreciate your patience as repairs are made



Effect:

  Loss of hot and cold domestic water. This means that no bathrooms,

  Showers and kitchens in all the D and D suites.



Warning:

To avoid flooding, please be sure all faucets are off and stay off for the duration of the shutdown.  If you try a faucet and find the water is still off, turn the faucet back off.



Manager

Michael Collins

Manager

Tang Residence Hall

Westgate Apartments

Massachusetts Institute of Technology

Housing Department

W84-104 617-253-5146

collinsm at mit.edu

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.mit.edu/pipermail/tang-residents/attachments/20221017/4282a99e/attachment.htm>


More information about the Tang-Residents mailing list