[Tang-Residents] water shut down for D and E suites
Michael J Collins
collinsm at mit.edu
Sun Jul 11 17:46:42 EDT 2021
EMERGENCY
W84 WATER SHUTDOWN
HOT & COLD WATER SHUTDOWN
D Kitchens and Bathrooms
E Kitchens and Bathrooms
Building Tang Hall
Date 7/12/2021
Day: MONDAY
9 am to 3pm
System: All domestic water (hot and cold)
Area effected: D and E SUITES
Repair waterpipe in 5D
We are hoping to have the repairs completed within 5 to 6 hours
Effect:
Loss of hot and cold domestic water. This means that no bathrooms,
Showers, kitchens and drinking fountains will be operational during
this shutdown.
I apologize for the inconvenience
Manager
Michael Collins
Manager
Tang Residence Hall
Westgate Apartments
Massachusetts Institute of Technology
Housing Department
W84-104 617-253-5146
collinsm at mit.edu
Michael Collins
House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
https://vimeo.com/534168435
550 Memorial Drive
Westgate Family Apartments
540 Memorial Drive
Cambridge Ma 02139
Office Tele. 617-253-5146
Repairs: - https://atlas.mit.edu/atlas/Main.action?tab=home&sub=group_servreq
More information about the Tang-Residents
mailing list