[Tang-Residents] FW: **Notification Only** Bldgs. W84 - Entire Buildings Monthly Test of the Automatic Transfer Switch

Michael J Collins collinsm at mit.edu
Fri Nov 8 11:33:34 EST 2019


Please disregard the first email.



Monthly Test of the Automatic Transfer Switch

On Tuesday Nov. 12, 2019 from 10am to 11am, The MIT Fire Protection Team will be testing the automatic transfer switches for Bldg. W84. The transfer switches provide AC power to the life safety and other critical building systems in the event of a power loss. Some equipment will experience a brief loss of power when switching from normal to generator power and from generator back to normal power. If properly maintained and safeguarded the equipment should function properly and remain in normal service under both power sources.

We apologize for any inconvenience this may cause you.

Facilities department
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/tang-residents/attachments/20191108/bc54bea6/attachment.html


More information about the Tang-Residents mailing list