[Tang-Residents] FW: *Approved* Domestic Hot and Cold Water for Bldg. W84-Tang Hall shutdown notification
Michael J Collins
collinsm at mit.edu
Mon Mar 25 11:17:16 EDT 2019
W84 WATER SHUTDOWN
ENTIRE BUIDLING
HOT & COLD WATER SHUTDOWN
Building Tang Hall
Date 3/27/19
Day: Wednesday
Time: 9am to 3pm
System: All domestic water (hot and cold)
Repair Water Drain Behind Wall In 17D
We are hoping to have the repairs completed within 5 to 6 hours
Effect:
Loss of hot and cold domestic water. This means that no bathrooms,
Showers, kitchens and drinking fountains will be operational during
this shutdown.
We apologize for the inconvenience
Manager
Michael Collins
Manager
Tang Residence Hall
Westgate Apartments
Massachusetts Institute of Technology
Housing Department
W84-104 617-253-5146
collinsm at mit.edu
Type: Normal
Date: March 27, 2019
Day: Wednesday
Time: 9am to 3pm
Building(s): W84
Room(s): Tang Hall
System: Domestic Hot and Cold Water
Duration: 6 hours
Reason:
plumbing repairs in suite 17D
Effect:
loss of Domestic Hot and Cold Water
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/tang-residents/attachments/20190325/21648e9c/attachment.html
More information about the Tang-Residents
mailing list