[Tang-Residents] W84 Kitchen Electrical service evaluation 23rd floor down to the 2nd.

Michael J Collins collinsm at mit.edu
Wed Feb 6 13:08:31 EST 2019


Update,
  This seems to be going a bit slower than anticipated and we will continue on testing into next week as well.
We are currently on the 17th floor working down.

Thank you
  Michael



From: Michael J Collins
Sent: Wednesday, January 30, 2019 11:46 AM
To: tang-residents <tang-residents at mit.edu>
Subject: W84 Kitchen Electrical service evaluation 23rd floor down to the 2nd.
Importance: High

 Hello

  Please be aware starting Monday Feb 4th  through Friday Feb 8th we will need  to enter your apartment for 15 to 20 minutes to perform an electrical service evaluation within your kitchen.
This will require us to pull the stove out away from the wall to check the outlet.  We will not be long in each apartment and will return the stove and lock up after they are done.
 You do not have to be present as this safety check is performed.

Thank you and please let me know if you have any questions

Michael Collins


House Operations Manager
Massachusetts Institute of Technology
Division of Student Life | Housing & Residential Services
Tang Residence Hall W84-104
550 Memorial Drive
Westgate Family Apartments
540 Memorial Drive
Cambridge Ma 02139
Office Tele. 617-253-5146

http://tang.mit.edu/
http://westgate.mit.edu/


Repairs:  - https://atlas.mit.edu/atlas/Main.action?tab=home&sub=group_servreq

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/tang-residents/attachments/20190206/1ca93d15/attachment.html


More information about the Tang-Residents mailing list