[Tang-residents] Fwd: Scheduled Water Shutdown Monday Jan.

Michael Collins collinsm at MIT.EDU
Tue Jan 17 11:42:22 EST 2006


         THE REPAIR HAS BEEN MADE AND THE WATER HAS BEEN RESTORED!



>Date: Fri, 13 Jan 2006 08:47:21 -0500
>To: tang-residents at mit.edu
>From: Michael Collins <collinsm at mit.edu>
>Subject: Scheduled Water Shutdown Monday Jan.
>
>HOT & COLD WATER SHUTDOWN
>TUESDAY  1-17-06
>8:30 AM  TO  3:00PM
>TANG HALL
>
>
>
>Building: TANG HALL
>Date: 1/17/06
>Day: TUESDAY
>
>Time: 8:30 AM - 3:00 PM
>System: All domestic water (hot and cold)
>Duration: 6 hours&..Maybe sooner
>Reason:
>  To replace expansion valve on the 11TH Floor
>
>Effect:
>Loss of hot and cold domestic water.  This means that no bathrooms,
>showers, kitchens and drinking fountains will be operational during
>this shutdown.
>
>Suggestion:
>
>Fill bathtub with water for duration of shutdown.    Use this water  to 
>flush your toilet.  Fill  a bucket from the tub and dump it into the 
>toilet bowl.    This will force the toilet to flush.
>
>Warning:
>
>To avoid flooding, please be sure all faucets are off and stay off for the 
>duration of the shutdown.   If you try a faucet and find the water is 
>still off, turn the faucet back off.
>
>Thank you for your patience
>Manager
>
>Michael Collins
>Manager
>Tang Residence Hall
>Westgate Apartments
>Massachusetts Institute of Technology
>Housing Department
>W84-104   617-253-5146
>collinsm at mit.edu




More information about the Tang-residents mailing list