Hello Fellow Wuggers,
 I am hoping someone can provide some guidance.  

*	
	We have a workflow with a step that runs a custom report.  
*	
	The object used is an extension/child of REPORT.  
*	
	We added a method (BuildSelTab) which creates the required lines
and fills the SelTab element in the task container.  
*	
	We entered BuildSelTab as a method Before Work Item Execution on
the step that executes the report.

The method works fine and we can see the SelTab in the container for
that step is holding the correct data.  However, when the report is
being run, it is not using the data from the SelTab.  
 
Note:  With previous designs, we ran the BuildSelTab as a separate
background task, and then bound the SelTab from the WS container into
the Execute Report step.  In that instance the report ran using the
SelTab.  The problem with that was that the flow would not advance from
dialog from the start form to the report screen, due to the background
step in-between.  We do not want the users to have to start the flow and
then enter the SBWP to execute the report.  
Note also:  Web is not an option with this particular flow.
 
Many Thanks in Advance for any suggestions!!
Regards,
Sherie
 
Sherie Munday
Workflow Developer/Analyst
Air Products & Chemicals, Inc.
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20070627/8ae82565/attachment.htm