Hi Parag,
 
I created a check fm in SWE3 for BUS1001006 VIEWCREATED WORKITEM.
In this fm I check whether the view letter specified in the workflow
container of _EVT_RECEIVER_ID is identical to the view letter (parameter
MaintenanceStatus) of the event.
 
Regards,
Tan Verschuijl.

-----Original Message-----
From: sap-wug-bounces at mit.edu [mailto:sap-wug-bounces at mit.edu] On Behalf Of
parag baldha
Sent: zaterdag, maart 26, 2005 8:44
To: sap-wug at mit.edu
Subject: Workflow termination issues



Hi!!! Workflower, 

I am developing workflow for material master create. scenario like user1
will create basic data1 and basic data2 then workflow should trigger and
when user2 press on workitem at that time control should go to next step for
creating missed views. same procedure until material creation has been
completed.

For above, I am using business object bus1001006 and asynchronous method
CREATEVIEWS. now problem is when user2 click on save after entering all the
required data, workflow is not terminating. its asynchronous event that's
way in terminating events tab i added element = _WI_OBJECT_ID, object type =
BUS1001006 and EVENT = VIEWCREATED. but i didn't make any binding there. is
there any binding requirement? or any other way can i solve this issues? 

Would be grateful if you could help me in this regard.

Thanks in advance,
Parag 



 <http://clients.rediff.com/signature/track_sig.asp>  

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.mit.edu/pipermail/sap-wug/attachments/20050408/2646504e/attachment.htm


More information about the SAP-WUG mailing list