Workflow between different R/3-Systems

Brilleman JOHANNES (Hans) JOHANNES.Brilleman at petrosa.co.za
Tue Sep 14 04:17:54 EDT 2004


=20         =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D    =
=20        =20
=20       Notice of Disclaimer: Please note that this e-mail, and the con=
tents thereof,=20
=20        is subject to the Standard PetroSA e-mail Disclaimer which is =
located at=20
=20                    http://www.petrosa.co.za/disclaimer.htm
=20         =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Hi Ute,
 
WS30000524 or WS71000008.
 
Hans
 
-----Original Message-----
From: SAP Workflow [mailto:Owner-SAP-WUG at MITVMA.MIT.EDU] On Behalf Of "Sc=
hr=F6der, Ute Marion"
Sent: 14 September 2004 08:48 AM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: AW: Workflow between different R/3-Systems
 
 
Hi Jocelyn,
 
thanx for your advise.
Anyway, I=B4m unable to find the workflow-deinition.
Does anyone have the workflow-Id so that I may be able to find it?
 
Just in case there may be differences,
I=B4m currently on a 4.7 system.
 
Thanx
 
Ute
 
-----Urspr=FCngliche Nachricht-----
Von: Dart, Jocelyn [mailto:jocelyn.dart at sap.com]
Gesendet: Montag, 13. September 2004 15:26
An: SAP-WUG at MITVMA.MIT.EDU
Betreff: Re: Workflow between different R/3-Systems
 
 
Ute,=20
Have you looked at the standard transport management workflow?=20
Regards,
Jocelyn =20
 
-----Original Message-----
From: SAP Workflow [mailto:Owner-SAP-WUG at MITVMA.MIT.EDU]=20
Sent: Monday,13 September 2004 10:08 PM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: Workflow between different R/3-Systems
 
Hi everybody,
 
I received a request and would like your opinion on this.
The Process is to take place on an SEM-system.
 
Data is to be entered into the Developmet System,
then the Controlling takes a look at the data,
after the approval is granted,
there has to be a synchronization
after that transport to qa-system=20
a second synchronizaton in the QA-system,
the data has to be checked=20
if the check was ok,=20
transport to productiv system
final synchronization
 
 
Is it possible to build such a workflow ?
 
 
I=B4m looking forward to any answer.
 
Thanx for your help
 
Ute
=20         =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
=20                     The Petroleum Oil & Gas Corporation of South Afri=
ca (Pty) Ltd=20
=20                            trading as "PetroSA" Reg. No. 1970/008130/=
07.=20
 
=20                                              Directors:
=20                              =20
=20                                       Dr P S Molefe (Chairman)
=20                                =20
=20                   Mr S Mkhize (Managing Director and Chief Executive =
Officer),
 
=20              Mr N G Nika (Executive), Mr A R Nkuhlu, Ms R J Huntley, =
Ms T C P Chikane,
 
=20                              Dr M S Mzimba, Mr N H Gumede, Prof. B Fi=
gaji,
 
=20                            Mr A W. Mjekula, Ms P P J Molefe, Mr T O M=
okwena
 
=20          =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 


More information about the SAP-WUG mailing list