Workflow Deadline Monitoring Question

Josefek, Richard RJosefek at MassMutual.com
Mon Dec 1 09:30:51 EST 2003


Mike,
Thank you so much for your response.=20
Shortly after receiving it, we implemented the change and our workflow =
processing has been working flawlessly since.=20
I cannot tell you how many hours have been put into researching this =
problem over the past year. We even went so far as opening up an OSS =
note with SAP. They were no help at all.=20
 
Thank you again!
 
Rick
 
-----Original Message-----
From: SAP Workflow [mailto:Owner-SAP-WUG at MITVMA.MIT.EDU]On Behalf Of
Michael Pokraka
Sent: Wednesday, November 19, 2003 7:17 AM
To: SAP-WUG at MITVMA.MIT.EDU
Subject: Re: Workflow Deadline Monitoring Question
 
 
Hi,
Check that your monitoring is configured for periodic deadline =
monitoring
(as opposed to as-needed). Non-periodic causes WI's to check and =
schedule
deadline jobs. In other words, if an item is created and it sees that no
job is scheduled before it's deadline, it will schedule it unless the
'periodic monitoring' is set.
Cheers
Mike
 
Somewhere in the mists of time Josefek, Richardwrote:
>> We've run into a problem that I'm hoping you can shed some light on =
for
>> us.  We've had a problem occurring in our Production environment =
since
>> last December, 2002.  Recently, these problems have been causing our
>> clients a lot of work to monitor and resolve.  Here's a synopsis:
>>
>> We use Maestro to control Workflow deadline monitoring.  Maestro runs
>> SWWDHEX on a schedule that our clients have requested.  We do not use
>> SAP.  However, last December, configuration for the SAP controlling =
of
>> deadline monitoring was turned on in our Production environment by an
>> SAP consultant.  We immediately corrected the situation and turned it
>> off.  However, this has caused a series of problems that we have yet =
to
>> recover from.
>>
>> Individuals approving within one of two workflows were causing the
>> SWWDHEX to instantiate in SAP (without their knowledge).  Once, this
>> happens, it continues every 10 minutes.   One of the things we did to
>> prevent this from happening was remove security from each individual.
>> However, we have found this is not a good solution because every once =
in
>> a while (under conditions we cannot determine) a client will receive =
an
>> error message "Background job SWWDHEX cannot be scheduled (error 6)".
>> Some of these clients will notice the error message and try to =
approve
>> the document again and the second time they are successful.
>>
>> We are assuming that the configuration that was turned on has somehow
>> caused this irrevocable process to begin, even though we have shut it
>> off.  We think that somewhere in the SAP environment, there is some
>> trigger that is causing this job to run.  (Perhaps an assumption in =
the
>> code that if we are not using permanent deadline monitoring, we must =
be
>> using periodic instead of checking table values?)
>>
>> Any assistance you can provide on what triggers there might be in SAP
>> that would cause this to happen would be much appreciated!
>>
>> Thanks!
> Rick
>
> ---------------------------------------------------------
> This e-mail transmission may contain information that is proprietary,
> privileged and/or confidential and is intended exclusively for the
> person(s) to whom it is addressed. Any use, copying, retention or
> disclosure by any person other than the intended recipient or the =
intended
> recipient's designees is strictly prohibited. If you are not the =
intended
> recipient or their designee, please notify the sender immediately by
> return e-mail and delete all copies.
>
> ---------------------------------------------------------
>
 


More information about the SAP-WUG mailing list