AW: Can't create Event PurchaseRequisition.significantlyChanged
Becker Stephan (extern)
Stephan.Becker.ext at mchw.siemens.de
Thu Jun 20 12:41:33 EDT 2002
Hi Josef,
silly question first: Are you changing the value more than the 10% =
tolerance
you have set in the characteristics?
If it's not that, then it would be good to check if the PO is relevant =
for
release (flag(s) on EKKO), the system probably doesn't create these =
events
if the PO is not relevant to release anyway..
Hth,
Stephan=20
-----Urspr=FCngliche Nachricht-----
Von: Josef Herwig [mailto:josef.herwig at gmx.de]
Gesendet: Donnerstag, 20. Juni 2002 11:59
An: SAP-WUG at MITVMA.MIT.EDU
Betreff: Can't create Event PurchaseRequisition.significantlyChanged
Hi Experts,
i have a little problem in our 4.5B System with creating the event
PurchaseRequisition.significantlyChanged by changing the purchase
requisiton.
i've made the following entries in the purchase requisition =
customizing:
Release Procedure --> Set Up Procedure with Classification
Release indicator =3D G
changes after start process:
changeability =3D 4
value chgs. =3D 10,0 percent
if these parameters set a message should be shown if you change the =
price or
the quantity of an item in the requisition. but it doesn't works
the event PurchaseRequisition.significantlyChanged is enabled
note: 0497928 is already maintained
Do you have any ideas?
Thanks Josef
--