Dear Colleagues,
During the access last Wednesday we met with the survey people to discuss
the work during the January shutdown. The proposal is to re-survey
the detector (target chamber, WC, 12deg lumi and Moller) as much as possible from the
upstream side (ring-outside) and from downstream. Some part of the detector
right side will not be visible due to the lead shielding wall.
The remaining shielding, mainly on the ring-outside will be completed after
the survey.
A final survey will be done in January 2013 after the second data taking run.
Please let me know if you have comments.
Best regards,
Uwe
_____________________________________________________
|
| Dr. Uwe Schneekloth
| OLYMPUS
| Deutsches Elektronensynchrotron
| Notkestrasse 85
| D-22603 Hamburg/Germany
| Tel: +49-40-8998 2007 Fax: +49-40-8998 3092
| email: uwe.schneekloth at desy.de
_____________________________________________________
More information about the Olympus
mailing list