[CSBi-HPC] NE47 (500 Tech Sq) Power Outage on Saturday
Al Davis
aldavis at wi.mit.edu
Thu Nov 4 16:52:56 EST 2004
I just learned today there will be a power outage for the entire 500 Tech Sq
building this Saturday that will last several hours. While there is emergency
power to keep the computers running, there will not be any AC in the server
room. Since the power outage will last several hours, I'll be shutting down all
the BioImaging servers & storage and the CSBi cluster to prevent them from
overheating.
I'll be shutting everything down on Friday after 5 PM and will start bringing
all the systems back up starting Sunday morning. I'll send around another email
when complete.
Please stop all jobs running on these systems prior to Friday night. Sorry for
the late notice as I was not on the original distribution list.
al
--
Al Davis aldavis at wi.mit.edu | aldavis at mit.edu
Systems Manager 617.324.0519
CSBi & WI/MIT BioImaging Center NE47 Rm 311 (500 Technology Sq)
More information about the CSBi-HPC-users
mailing list