[CSBi-HPC] CSBi HPC p655 cluster downtime
James G. Evans
jgevans at wi.mit.edu
Thu Jan 29 18:53:48 EST 2004
Hi
We are planning to integrate both halves of the p655 cluster sometime in
February or March. The plan is that this will not cause any downtime as the
WI half of the cluster will remain operational. However, the CSAIL nodes
will not be accessible during the physical relocation of that half of the
cluster from 200 Tech Sq to 500 Tech Sq.
We anticipate only 1 day to move but want to poll the users to see if there
are any dates that we should avoid? Obviously we would not want to interfere
with any grants, conferences, theses etc deadlines.
Please let me know if there any conflicts as soon as possible.
Thanks
James
----------------------------------------------------------------------
James G. Evans Ph.D.
CSBi Research Scientist
Whitehead MIT BioImaging Center
500 Technology Square (NE47-311)
Cambridge MA 02139
U.S.A.
phone 617 324 0300
fax 617 258 7226
email jgevans at wi.mit.edu
----------------------------------------------------------------------
More information about the CSBi-HPC-users
mailing list