<font face="sans-serif" size="2">Krishna,</font><br>Please check if your customer FM is an RFC enabled FM or not.<br>Best Regards,<br>Jimmy Sun<br><div class="gmail_quote">On Sat, Mar 12, 2011 at 7:37 AM, Krishna K Kammaje <span dir="ltr">&lt;<a href="mailto:kkammaje@in.ibm.com">kkammaje@in.ibm.com</a>&gt;</span> wrote:<br>
<blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;"><font face="sans-serif" size="2">Hi,</font>
<br>
<br><font face="sans-serif" size="2">Recently our basis team complained that
there are too many DIA work processes occupied by WF-BATCH user. I found
that this is caused by a recently introduced new WF task, which calls a
custom FM. But the task is marked as &quot;Background&quot; and Synchronous.
So as I understand, it should not take a DIA work process but a BTC work
process (background).</font>
<br>
<br><font face="sans-serif" size="2">Please let me know your views.</font>
<br>
<br><font face="sans-serif" size="2">Thanks<br>
Krishna Kishor Kammaje <br>
</font><br>_______________________________________________<br>
SAP-WUG mailing list<br>
<a href="mailto:SAP-WUG@mit.edu">SAP-WUG@mit.edu</a><br>
<a href="http://mailman.mit.edu/mailman/listinfo/sap-wug" target="_blank">http://mailman.mit.edu/mailman/listinfo/sap-wug</a><br>
<br></blockquote></div><br><br clear="all"><br><br><br><br>