<font size=2 face="sans-serif">Hi all,</font>
<br>
<br><font size=2 face="sans-serif">We have many workflows, which do not
have an expiry date (dating in 2009 and before). Meaning, if the approver
does not take action, it remains in his worklist/inbox forever. </font>
<br><font size=2 face="sans-serif">We have 25000+ items dating back to
2009 and before. Most of these are in 'Ready' state and I thought it is
good to clear them off keeping system performance in view. </font>
<br>
<br><font size=2 face="sans-serif">I would like to know what is the best
way to handle these workitems. Some options I see are</font>
<br>
<br><font size=2 face="sans-serif">1. Deleting the dialog workitems in
ready and reserved</font>
<br><font size=2 face="sans-serif">2. Deleting the parent workitem, including
all children</font>
<br><font size=2 face="sans-serif">3. Completing dialog workitems ??</font>
<br>
<br><font size=2 face="sans-serif">Please let me know your views</font>
<br>
<br><font size=2 face="sans-serif">Thanks<br>
Krishna Kishor Kammaje <br>
</font>