<br><font size=2 face="sans-serif">Sandy,</font><br><br><font size=2 face="sans-serif">I'm sorry I cannot answer your specific
questions below (I only have intermediate WF skillz). &nbsp;However, each
of your points sounds reasonable and shouldn't take too long to check and
see if it is necessary once you have an upgraded test system to work with.
&nbsp;The real experts here can probably provide you with better feedback.</font><br><br><font size=2 face="sans-serif">I only wanted to make the point that
we upgraded to ECC 6.0 roughly 1.5 years ago, and many of our workflows
were trainwrecks afterward. &nbsp;In fact it was at that point that I really
learned workflow as just about every custom workflow we use broke after
the upgrade. &nbsp;Granted I work in a heavily customized environment (the
land of 'Z'...) so I don't think this was so much a problem with SAP products,
but of our own making. &nbsp;Incidentally, we didn't seem to have any problems
with pure out-of-the-box SAP supplied workflows (which we mostly use in
HR).</font><br><br><font size=2 face="sans-serif">In any case, from my own experience
(if I ever had to do this again), I would:</font><br><font size=2 face="sans-serif">1. Pay particular attention to agent
determination, especially if you are using custom agent determination rules
and techniques</font><br><font size=2 face="sans-serif">2. Seperate testing for new workflow
instances versus existing instances (those workflow instances that already
are running at the time of the upgrade). &nbsp;Most of the problems we
experienced were with already-running workflows - of which there were hundreds.</font><br><br><font size=2 face="sans-serif">The 2 areas where we experienced the
most problems were with travel approval and incoming invoice processing,
which for us, are almost entirely custom everything (objects, events, programs,
you name it...).</font><br><br><font size=2 face="sans-serif">Just a friendly FYI, nothing more.<br></font><font size=4 color=#808000><b> </b></font><p><font size=4 color=#808000><b>Michael McLey</b></font><font size=3 color=#808000><b></b><br>MBUSI - IT Parts &amp; Administration </font><font size=2 color=#808000><br>Mercedes-Benz US International, Inc.</font><font size=3 color=#808000></font><font size=2 color=#808000><br>1 Mercedes Drive</font><font size=3 color=#808000> </font><font size=2 color=#808000><br>Vance, AL 35490</font><font size=3 color=#808000> </font><font size=2 color=#808000><br>PHONE:&nbsp; (205) 462 - 5239</font><font size=3 color=#808000> </font><font size=2 color=#808000><br>EMAIL:&nbsp;&nbsp; michael.mcley@daimler.com</font><font size=3 color=#808000>&nbsp;&nbsp;
</font><br><br><br><table width=100%><tr valign=top><td width=40%><font size=1 face="sans-serif"><b>sandysydney@gmail.com</b></font><br><font size=1 face="sans-serif">Sent by: sap-wug-bounces@mit.edu</font><p><font size=1 face="sans-serif">11/01/2010 07:20 PM</font><table border><tr valign=top><td bgcolor=white><div align=center><font size=1 face="sans-serif">Please respond to<br>sap-wug@mit.edu</font></div></table><br><td width=59%><table width=100%><tr valign=top><td><div align=right><font size=1 face="sans-serif">To</font></div><td><font size=1 face="sans-serif">sap-wug@mit.edu</font><tr valign=top><td><div align=right><font size=1 face="sans-serif">cc</font></div><td><tr valign=top><td><div align=right><font size=1 face="sans-serif">Subject</font></div><td><font size=1 face="sans-serif">Workflow Upgrade 4.6C to ECC6 - manual
settings during Cutover &amp; &nbsp; &nbsp; &nbsp; &nbsp;Version</font></table><br><table><tr valign=top><td><td></table><br></table><br><br><br><font size=2 face="Arial">Hello Guys,<br><br>We are upgrading to ECC 6 from 4.6C and we are on release 701 &amp; support
pack SAPKB70106.<br><br>I would like to know which are the &quot;<b>Manual activities</b>&quot;
that needs to done during cutover and <b>WHEN</b> should these should be
done (eg. before ECC6 upgade, or after ECC6 upgrade but before config/dev
transports, or after config/dev transports).<br><br>I have looked on few threads and found the following info. Please correct
me or add extra info if i have missed something:<br><br>1. Configure RFC destination &amp;&nbsp;other mandatory options&nbsp;in
Transaction SWU3.<br>2. Run Transaction SWU_OBUF to clear the runtime buffers before users start
Testing.<br><br>I assume rest of changes would be imported with transports, but i have
read through lot of SDN threads that <b>all custom Workflow definitions
needs to be ACTIVATED in each system (DEV - QAS- PRD)</b> and <b>custom
BOR objects needs be REGENERATED in each system (DEV - QAS- PRD).</b> Also,
do I have manually <b>set the agent assignement for Customer Task as GENERAL
TASK</b> in each system? Are above stated 3 steps needs to be manually
done in each system or transports take care of them ? I am bit confused.
Could anybody please advise me regarding the <b>Manual Task/activities
that needs to done in each system during cutover during WF upgrade from
4.6 C to ECC6.</b><br><br>Thanks for posting excellent stuff regarding the Workflow Upgrades on this
mailing list. It really helped me in resolving most of my issues.<br><br>Thanks in advance<br><br>Kind Regards<br><br></font><br><br><font size=3><i>Regards</i> </font><br><br><font size=3><b><i>Sandy</i></b></font><br><font size=3><i>&nbsp;</i></font><br><br><tt><font size=2>_______________________________________________<br>SAP-WUG mailing list<br>SAP-WUG@mit.edu<br>http://mailman.mit.edu/mailman/listinfo/sap-wug<br></font></tt><br><font face="sans-serif"><font face="sans-serif, Arial, Helvetica" size="-1" color="#808080"><br>If you are not the intended addressee, please inform us immediately that you have received this e-mail in error, and delete it. We thank you for your cooperation.