<br><font size=2 face="sans-serif">Joe,</font>
<br>
<br><font size=2 face="sans-serif">It went to all because that is the default
if no actual agent is determined. &nbsp;There are probably a few ways to
do this but you need to get these workitems out of everybody else's inbox,
so i suggest you initially reserve them all yourself. &nbsp;Have a colleague
execute SWI2_ADM1to identify all the workitems without agent using the
appropriate task and then forward them to yourself (you can't forward to
yourself). &nbsp;Once they are in your inbox you have some time to decide
what to do (eg. logically delete all of them - &nbsp;a long task). &nbsp;Maybe
other WUG members have ideas of how to process these more quickly.</font>
<br>
<br><font size=2 face="sans-serif">Karl Nietz<br>
 </font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">From:</font>
<td><font size=1 face="sans-serif">joe kirubagaran &lt;joekirubagaran@gmail.com&gt;</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">To:</font>
<td><font size=1 face="sans-serif">&quot;SAP Workflow Users' Group&quot;
&lt;sap-wug@mit.edu&gt;</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Date:</font>
<td><font size=1 face="sans-serif">19/08/2010 03:58 PM</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Subject:</font>
<td><font size=1 face="sans-serif">Revert back UWL</font></table>
<br>
<hr noshade>
<br>
<br>
<br><font size=3><br>
Hi Everyone,</font>
<br><font size=3>&nbsp;</font>
<br><font size=3>I am stuck up with an issue. We had a task a user decision
step&nbsp;in production that had no agent assignment . So it was not working
fine and around 5000 entries for that task has been processed . And the
workflow was not showing any kind of error for that . In log i had the
only one messege telling that&nbsp;agent&nbsp;determination failed and
it&nbsp;was in green . Then i&nbsp; changed the task to general task and
transported through RH_REMOVE30 . Now &nbsp;&nbsp;the problem is the pending
requests has been triggerd to all. My company dosenot want them to be processed
. So i need to revert back the UWLs and complete the worklfow at this stage
itself. I need this to be done for 5000 UWLs. So can anyone tell me how
to revert back the UWLs and complete the workflow ...............</font>
<br><font size=3>&nbsp;</font>
<br><font size=3>&nbsp;</font>
<br><font size=3><br>
-- <br>
Thanks &amp; Regards<br>
Joe Kirubagaran.J</font><tt><font size=2>_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
</font></tt><a href="http://mailman.mit.edu/mailman/listinfo/sap-wug"><tt><font size=2>http://mailman.mit.edu/mailman/listinfo/sap-wug</font></tt></a><tt><font size=2><br>
</font></tt>
<br>
<br>