<br><font size=2 face="sans-serif">It is likely that you have the type
linkage setting for your triggering event set to 'Deactivation of Linkage'
when an error occurs (parameter 'Behaviour Upon Error Feedback'). &nbsp;You
should change this to something more benign. &nbsp;Also check the report
of workflows in error (SWI2_DIAG) to see if you have workflows in error,
and review and clear them.</font>
<br>
<br><font size=2 face="sans-serif">Karl Nietz<br>
Senior Consultant<br>
CSC Australia<br>
Ph: 61 3 8695 1157<br>
Mob: 61 434 181303<br>
<br>
Please consider the environment before printing this e-mail. &lt;br&gt;
&lt;br&gt;CSC - This is a private message. If you are not the intended
recipient, please delete without copying and kindly advise us by e-mail
of the mistake in delivery. Note: Regardless of content, this e-mail shall
not operate to bind CSC to any order or other contract unless pursuant
to explicit written agreement or government initiative expressly permitting
the use of e-mail for such purpose • CSC Australia Pty Limited; Registered
Office: 5B/26 Talavera Road, Macquarie Park NSW 2113 Australia; Incorporated
in Australia. ACN: 008 476 944</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">From:</font>
<td><font size=1 face="sans-serif">&quot;Patil, Priyank&quot; &lt;Priyank.Patil@keane.com&gt;</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">To:</font>
<td><font size=1 face="sans-serif">&quot;SAP Workflow Users' Group&quot;
&lt;sap-wug@mit.edu&gt;</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Date:</font>
<td><font size=1 face="sans-serif">23/06/2010 04:08 PM</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Subject:</font>
<td><font size=1 face="sans-serif">Workflows getting inactive in Prod frequently</font></table>
<br>
<hr noshade>
<br>
<br>
<br><font size=2 face="Calibri">&nbsp;</font>
<br><font size=2 face="Calibri">Hi,</font>
<br><font size=2 face="Calibri">&nbsp; &nbsp; &nbsp;We are facing serious
a problem in production. The workflows which are existing in Prod are automatically
getting inactive. The event link in SWDD are getting inactive frequently
and the mail/workitems are not getting triggered. Since every time we need
to login to Prod and activate the event linkage in the workflow builder.
Is there any permanent solution for this??.We are into Ecc6.</font>
<br><font size=2 color=#004080 face="Arial">______________________</font>
<br><font size=2 color=#4181c0 face="Arial">Thanks and Regards,</font>
<br><font size=2 color=#4181c0 face="Arial"><b>Priyank Dev Patil.</b></font>
<br><font size=2 face="Calibri">&nbsp;</font>
<p><font size=3><br>
______________________________________________________________________<br>
Disclaimer: This email message and any attachments are for the sole use
of the intended recipient(s) and may contain information that is confidential,
legally privileged or otherwise exempt from disclosure under applicable
law. If you are not the intended recipient(s) or have received this message
in error, you are instructed to immediately notify the sender by return
email and required to delete this message from your computer system. This
communication does not form any contractual obligation on behalf of the
sender, the sender's employer or such employer's parent company, affiliates
or subsidiaries.</font><tt><font size=2>_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
</font></tt><a href="http://mailman.mit.edu/mailman/listinfo/sap-wug"><tt><font size=2>http://mailman.mit.edu/mailman/listinfo/sap-wug</font></tt></a><tt><font size=2><br>
</font></tt>
<p>
<p>