<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD><TITLE></TITLE>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2900.3527" name=GENERATOR></HEAD>
<BODY><!-- Converted from text/plain format -->
<DIV><FONT face=Arial color=#0000ff size=2>Hi all,<BR><BR>Something has just 
brought to my attention and was never aware of the functionality!</FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2></FONT>&nbsp;</DIV>
<DIV><FONT color=#0000ff><FONT face=Arial size=2>We have tasks that have 
"Requested Start" deadlines. </FONT></FONT></DIV>
<DIV><FONT color=#0000ff><FONT face=Arial size=2>Task starts and goes into wait. 
</FONT></FONT></DIV>
<DIV><FONT color=#0000ff><FONT face=Arial size=2>But, users can just go 
into&nbsp;SBWP, in the Resubmission folder, end resubmission, and execute the 
tasks! This a bug? </FONT></FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2>I do not want user executing task 
until the deadline! </FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial color=#0000ff size=2>I DO NOT recall this working this way 
in 4.6c. </FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial color=#0000ff size=2>Below&nbsp;is the help text from the 
task builder for "Requested Start" describing&nbsp;how it&nbsp;functionality and 
</FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2>I see nothing in the help files that 
indicate it can be picked up from the Resubmission folder and </FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2>executed&nbsp;BEFORE the start date. 
</FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2>&nbsp;</DIV></FONT>
<DIV><FONT face=Arial color=#0000ff size=2>&gt;How Does the Requested Start 
Work?<BR>&gt;If the requested start for a dialog work item is reached, the work 
item is placed in the Workflow Inboxes of the recipients.<BR>&gt;If the 
requested start for a background is reached, the workflow system starts 
automatically with the execution of the work item.<BR>&gt;Whether the requested 
start has been reached is checked by the background job for missed deadline that 
is run periodically.<BR><BR><BR>Rick Sample | Office (314) 573-5822 | Mobile 
(314) 952-2273 | rick.sample@graybar.com<BR>www.graybar.com &lt;</FONT><A 
href="http://www.graybar.com/"><FONT face=Arial 
size=2>http://www.graybar.com/</FONT></A><FONT face=Arial color=#0000ff 
size=2>&gt;&nbsp; - Graybar Works to Your 
Advantage<BR><BR></FONT></DIV></BODY></HTML>