Hi all,<BR>
<BR>
we had an issue on our productive environment which caused several shordumps. This resulted in several workflows in status STARTED. For these workflows, the system tried&nbsp;several times&nbsp;to&nbsp;restarted the workflow (I think by job SWWERRE) which resulted in a new workflow instance. But untill the fix was on production, the new workflows also resulted in STARTED. So now, I have for 1 process about 10 - 15 workflows in status STARTED.<BR>
<BR>
The fix is now on production but I still have a number of workflows in status STARTED. <BR>
When I look at the workflows concerning 1 case, the last one is ok and works fine now (1 dialog task in an inbox), the rest is not started again. <BR>
<BR>
1) how is this handled? Is only the last one active and the rest is redundant?<BR>
2) how are the 'old' workflows cleaned / changed from status? Is this automaticaly?<BR>
3) is there a link between the new workflows and the original workflow which initialy caused the error?<BR>
(so I can make a list and do a cross/check and if neccessary, perhaps remove them myself)<BR>
<BR>
We are on SAP (IS-U) 4.6 C<BR>
<BR>
Hope someone can explain it to me.<BR>
<BR>
Best regards,<BR>
Robert<BR>
<BR>