<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2>Hi Tom, </FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2>You MUST schedule RSWNUWLSEL in both FULL and DELTA modes
to satisfy the validation checks performed by the UWL Admin. Without this, delta
pull will not be used at all!!! So yes the parameters make a difference.
And you want delta pull because it makes a significant difference - obvious even
at small sites. </FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2>The reason given for scheduling in the future was that some
sites were experiencing clashes/deadlocks between RSWNUWLSEL and
SWN_SELSEN. That hasn't happened to me on site as yet so it may be a
volume issue, but the approach is reasonable if you are experiencing such
deadlocks. You cannot simply delete the jobs for RSWNUWLSEL.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2>Regards,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2>Jocelyn</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=144125821-29012009><FONT face=Arial
color=#0000ff size=2></FONT></SPAN> </DIV><FONT face=Arial color=#0000ff
size=2></FONT><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> sap-wug-bounces@mit.edu
[mailto:sap-wug-bounces@mit.edu] <B>On Behalf Of </B>Simon, Tom<BR><B>Sent:</B>
Friday, 30 January 2009 12:53 AM<BR><B>To:</B>
sap-wug@mit.edu<BR><B>Subject:</B> [LIKELY JUNK]UWL - Extended
Notfications<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009>Jocelyn:</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>Thank you for the
assistance. </SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>When describing the
delta pull mechanism as being optimized I believe it means that you are able to
change the default setting for retrieval of workitems for delta pull from every
60 seconds to whatever time period you choose based on the parameter setting you
make in the UWL Adminstration page under System Administration in the
Portal. The Snapshot Refresh Period default is every new session.
For it to be optimized it relies on two variants of RSWNUWLSEL. One of the
RSWNUWSEL variants is a full pull, once per day, the other is a delta
pull, every 1, 2 or 3 minutes, etc. The two jobs of the variants should be
scheduled to match the parameter setting in the UWL Administration Page.
The only way to get those parameters saved in the UWL Administration is if you
have the two jobs of the variants of RSWNUWLSEL released.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009></SPAN></FONT><FONT
face=Arial size=2><SPAN class=220040213-29012009></SPAN></FONT><FONT face=Arial
size=2><SPAN class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>Do you agree with
the previous post that you still need to schedule the two variants
for RSWNUWLSEL in the future 12/31/9999 for delta pull to be optimized for
EXTENDED NOTIFICATIONS . The extended notifications documentation for
using the UWL states not to run the background job variants for RSWNUWLSEL and
schedule a background job for SWN_SELSEN.</SPAN></FONT><FONT face=Arial
size=2><SPAN class=220040213-29012009> When I deleted the two variants for
RSWNUWLSEL I received a message in the UWL Administration that delta pull
was not optimized AND the parameters for Deltal Pull Channel Refresh Period and
Delta Pull snapshot Refresh were cleared.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>I just wanted to
verify that in the UWL Administration the parameters make a difference for Delta
Pull Channel Refresh Period and Deltal Pull Snapshot Refresh
Period for EXTENDED NOTIFICATIONS and background job of
SWN_SELSEN. If not then there is no reason to run the background
jobs of rswnuwlsel.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>What do you
think?</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=220040213-29012009></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN class=220040213-29012009>Tom
Simon</SPAN></FONT></DIV></BODY></HTML>