<br><font size=2 face="sans-serif">Hmmm, check how the user master for
WF-BATCH date format is set up - just a thought.</font>
<br>
<br><font size=2 face="sans-serif">cheers,</font>
<br>
<br><font size=2 face="sans-serif">Cristiana</font>
<br>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td width=40%><font size=1 face="sans-serif"><b>&quot;Ibrahim Khan&quot;
&lt;ikhansap@gmail.com&gt;</b> </font>
<br><font size=1 face="sans-serif">Sent by: sap-wug-bounces@mit.edu</font>
<p><font size=1 face="sans-serif">31/07/2008 06:04 PM</font>
<table border>
<tr valign=top>
<td bgcolor=white>
<div align=center><font size=1 face="sans-serif">Please respond to<br>
&quot;SAP Workflow Users' Group&quot; &lt;sap-wug@mit.edu&gt;</font></div></table>
<br>
<td width=59%>
<table width=100%>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">To</font></div>
<td><font size=1 face="sans-serif">&quot;SAP Workflow Users' Group&quot;
&lt;SAP-WUG@mit.edu&gt;</font>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">cc</font></div>
<td>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">Subject</font></div>
<td><font size=1 face="sans-serif">Problem with task description</font></table>
<br>
<table>
<tr valign=top>
<td>
<td></table>
<br></table>
<br>
<br>
<br><font size=3>Hi Friends,<br>
 I have mentioned the workitem execution date from my task container &nbsp;element
in the task description and it is available in the format MM/DD/YYYY(I
have checked the workflow log) . But when i see the document in SBWP the
date format is MM.DD.YYYY. Even i have check the default settings for user
master record its also in the MM/DD/YYYY, but why in the document it is
showing in MM.DD.YYYY format. Any idea Pls reply...</font><font size=2 face="Arial">_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
http://mailman.mit.edu/mailman/listinfo/sap-wug<br>
</font>
<br>