<br><font size=2 face="sans-serif">Thanks Tjetil,</font>
<br>
<br><font size=2 face="sans-serif">I modelled a 5th branch with a &quot;*do
nothing&quot; background task, executed after 8hrs. works fine. </font>
<br><font size=2 face="sans-serif">thanks for all of your answers.</font>
<br>
<br><font size=2 face="sans-serif">regards and have a nice weekend!</font>
<br><font size=2 face="sans-serif">Chris</font>
<br>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td width=40%><font size=1 face="sans-serif"><b>Kjetil Kilhavn &lt;kjetil.kilhavn@bluec.no&gt;</b>
</font>
<br><font size=1 face="sans-serif">Gesendet von: sap-wug-bounces@mit.edu</font>
<p><font size=1 face="sans-serif">11.04.2008 12:28</font>
<table border>
<tr valign=top>
<td bgcolor=white>
<div align=center><font size=1 face="sans-serif">Bitte antworten an<br>
&quot;SAP Workflow Users' Group&quot; &lt;sap-wug@mit.edu&gt;</font></div></table>
<br>
<td width=59%>
<table width=100%>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">An</font></div>
<td><font size=1 face="sans-serif">&quot;SAP Workflow Users' Group&quot;
&lt;sap-wug@mit.edu&gt;</font>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">Kopie</font></div>
<td>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">Thema</font></div>
<td><font size=1 face="sans-serif">Re: End Workflow after n-hours</font></table>
<br>
<table>
<tr valign=top>
<td>
<td></table>
<br></table>
<br>
<br>
<br><tt><font size=2>On Thursday 10 April 2008 12:11:02 Christian Wallner
wrote:<br>
&gt; Hi WUGers!<br>
&gt;<br>
&gt; I have a question which I'm sure is easy to answer for some guys here:<br>
&gt; I want a workflow to terminate itself after n hours because its obsolete<br>
&gt; then. Basically the wf is quite simple, it consists of a parallel
section<br>
&gt; with 4 branches (1 out of 4 to complete). So my first thought was
a wait<br>
&gt; event in a 5th branch. But unfortunately I didn't find out how to
tell<br>
&gt; this step to terminate itself after wf creation date+n hours.<br>
&gt;<br>
&gt; Any ideas?<br>
Already answered, but it seems everyone wants that fifth branch. In your
case <br>
it is not really necessary, but you may still want one to make the reporting
<br>
easier if you have any. However, you *could* simply define a Latest End
<br>
deadine on any of the four steps you already have active and terminate
the <br>
workflow that way (this will be a modelled deadline of course).<br>
-- <br>
Kjetil Kilhavn (+47 40220607)<br>
Blue Consulting AS (http://www.bluec.no/)<br>
_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
http://mailman.mit.edu/mailman/listinfo/sap-wug<br>
</font></tt>
<br><small><br><br>AT&S Austria Technologie & Systemtechnik AG<br>
Legal form | Rechtsform: Aktiengesellschaft<br>
Registered office | Sitz: Fabriksgasse 13, 8700 Leoben, Austria<br>  
Commercial Register Number | Firmenbuchnummer: FN 55638 x, Landesgericht Leoben <br><br>
This e-mail and any attachment may contain confidential and/or privileged information. If you are not the intended recipient (or have received this e-mail in error) please notify the sender immediately and destroy this e-mail. Any unauthorised copying, disclosure or distribution of the material in this e-mail is strictly forbidden.
</small>