<br><font size=2 face="sans-serif">Hi WUGers!</font>
<br>
<br><font size=2 face="sans-serif">I have a question which I'm sure is
easy to answer for some guys here:</font>
<br><font size=2 face="sans-serif">I want a workflow to terminate itself
after n hours because its obsolete then. Basically the wf is quite simple,
it consists of a parallel section with 4 branches (1 out of 4 to complete).
So my first thought was a wait event in a 5th branch. But unfortunately
I didn't find out how to tell this step to terminate itself after wf creation
date+n hours.</font>
<br>
<br><font size=2 face="sans-serif">Any ideas?</font>
<br>
<br><font size=2 face="sans-serif">regards,</font>
<br><font size=2 face="sans-serif">Chris</font>
<br><small><br><br>AT&S Austria Technologie & Systemtechnik AG<br>
Legal form | Rechtsform: Aktiengesellschaft<br>
Registered office | Sitz: Fabriksgasse 13, 8700 Leoben, Austria<br>  
Commercial Register Number | Firmenbuchnummer: FN 55638 x, Landesgericht Leoben <br><br>
This e-mail and any attachment may contain confidential and/or privileged information. If you are not the intended recipient (or have received this e-mail in error) please notify the sender immediately and destroy this e-mail. Any unauthorised copying, disclosure or distribution of the material in this e-mail is strictly forbidden.
</small>