Sounds like you&#39;ve got a Requested Start defined on the Step which is effectively a delay. <br><br>Have fun,<br>Mark<br><br><div><span class="gmail_quote">On 10/10/07, <b class="gmail_sendername">Prasad, Prashanthi</b>
 &lt;<a href="mailto:pprasad@citgo.com">pprasad@citgo.com</a>&gt; wrote:</span><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">






<div>


<p><font face="Arial" size="2">Hello Guru&#39;s,</font>
</p>

<p><font face="Arial" size="2">&nbsp;&nbsp; I have a Purchase order workflow and recently I added a task which is a background task. I have a method where I pass the PO number and get the release code from the method to the task. I have defined this standard task as Synchronous and Background. For some reason, when the workflow gets triggered, it comes to this step and sits for 10 minutes. After 10 minutes, it goes to the next step. I checked all the jobs and scheduled one of the jobs(SWWERRE) to run every 3 minutes to see if that's the problem, but didn't work. Any suggestions please? I have this job SWWCOND which is scheduled to run every 30 minutes. Not sure if this has anything but the Purchase req works fine.
</font></p>

<p><font face="Arial" size="2">I have a workflow for Purchase requisition and I have a similar task(Background) and that works just fine.</font>
</p>

<p><font face="Arial" size="2">We are on ECC 6.</font>
</p>

<p><font face="Arial" size="2">Thanks </font>

<br><font face="Arial" size="2">Prashanthi</font>
</p>

</div>
<br>_______________________________________________<br>SAP-WUG mailing list<br><a onclick="return top.js.OpenExtLink(window,event,this)" href="mailto:SAP-WUG@mit.edu">SAP-WUG@mit.edu</a><br><a onclick="return top.js.OpenExtLink(window,event,this)" href="http://mailman.mit.edu/mailman/listinfo/sap-wug" target="_blank">
http://mailman.mit.edu/mailman/listinfo/sap-wug</a><br><br></blockquote></div><br>