<br><font size=2 face="sans-serif">Hi</font>
<br>
<br><font size=2 face="sans-serif">As part of an upgrade to ECC6.0 I was
having problems with the SAP standard DMS Distribution workflow. I carried
out a consistency check on the workflow WS20000104, and got the following
error <b>Indicator &quot;Results Parameter&quot; missing in BOR method
create</b> (same error for methods Check &amp; Bundle also).</font>
<br>
<br><font size=2 face="sans-serif">No changes have been made to this workflow.
&nbsp;Anyone had a similar problem and an idea how to fix it?</font>
<br>
<br><font size=2 face="sans-serif">Many thanks</font>
<br>
<br><font size=2 face="sans-serif">John<br>
<br>
CSC Computer Sciences Limited<br>
Registered Office: Royal Pavilion, Wellesley Road, Aldershot, Hampshire,
GU11 1PZ, UK<br>
Registered in England No 0963578<br>
<br>
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------<br>
This is a PRIVATE message. If you are not the intended recipient, please
delete without copying and kindly advise us by e-mail of the mistake in
delivery. <br>
NOTE: Regardless of content, this e-mail shall not operate to bind CSC
to any order or other contract unless pursuant to explicit written agreement
or government initiative expressly permitting the use of e-mail for such
purpose.<br>
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------<br>
</font>