<div>Thank You For you response Dave.. </div>
<div>I had read about the SWEL being not existent, thanks for confirming. We will miss this feature dearly.</div>
<div> I did scan the the OSS Notes for WS10000256 and all of them suggest that this workflow is still valid. </div>
<div><strong></strong> </div>
<div><strong>Example Note : 826487 says the following : Deactivate Workflow WS10000256<br></strong>If your Source Release is EBP 3.0 or lower, workflow WS10000256 may have been activated by the upgrade. Check the event linkages for the workflow and, if necessary, deactivate it.
</div>
<div> </div>
<div>Any other thoughts ?</div>
<div>Shalini <br><br> </div>
<div><span class="gmail_quote">On 3/12/07, <b class="gmail_sendername">Dave Weston</b> <<a href="mailto:Dave.Weston@clockwork.ca">Dave.Weston@clockwork.ca</a>> wrote:</span>
<blockquote class="gmail_quote" style="PADDING-LEFT: 1ex; MARGIN: 0px 0px 0px 0.8ex; BORDER-LEFT: #ccc 1px solid">Shalini, usually if something is marked as Obsolete then SAP has replaced it with a newer version. Check to see if there is a replacement for the old workflow template, maybe in the release notes, OSS etc.
<br><br>That message about amiguity usually means the system is trying to start more than one template, maybe check your start conditions or try using that function module I sent in a previous post and see what that tells you.
<br><br>As far as I know SRM does not record the events in SWEL.<br><br>Cheers<br>Dave<br><br><br>-----Original Message-----<br>From: <a href="mailto:sap-wug-bounces@mit.edu">sap-wug-bounces@mit.edu</a> on behalf of Shalini Sabnani
<br>Sent: Mon 3/12/2007 12:23 PM<br>To: SAP Workflow Users' Group<br>Subject: Confirmation Workflow WS10000256 does not trigger in SRM 5, ECC 6<br><br>Hello<br>We have recently upgraded from R/3 4.6 to ECC 5.00 and EBP
3.0 to SRM 5.00.<br><br>When creating a confirmation for PO's, I get the following hard Error<br>"Approval workflow is ambiguous. Inform system administrator " and I thus<br>cannot create a confirmation.<br>
<br>Workflow is activer and so is the event linakge (SWETYPV). The business<br>object works fine, has no errors. In SWUD when I simulate the event<br>BUS2203-SAVED I am told that Workflow WS10000256 will trigger once the Start
<br>Conditions are verified. My start conditions are very specific and should<br>trigger WS10000256 but I notice from SWEL that there was no event<br>triggered, which tells me that the error occurs even before the event is
<br>triggered.<br><br>The only thing that stands out to me is that post upgrade to SRM, the<br>release status of this Workflow ( Basic Data) was changed to "Obsolete", I<br>changed this to "Implemented"
<br><br>Have any of you who have upgraded to a similar version come across this<br>problem, any pointer towards a solution would be highly appreciated<br><br>Thanks a bunch !<br>Shalini<br><br><br>_______________________________________________
<br>SAP-WUG mailing list<br><a href="mailto:SAP-WUG@mit.edu">SAP-WUG@mit.edu</a><br><a href="http://mailman.mit.edu/mailman/listinfo/sap-wug">http://mailman.mit.edu/mailman/listinfo/sap-wug</a><br><br><br></blockquote></div>
<br>