<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2900.2995" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Prem,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Any time you are going to modify a standard task, it is 
best to copy it to a custom task.&nbsp; Of course you can change some things 
(like agents) without having to modify the task.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Best of Luck,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Sherie</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Sherie Munday</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Workflow Developer/Analyst </FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=049185317-11122006><FONT face=Arial 
color=#0000ff size=2>Air Products &amp; Chemicals, Inc.</FONT></SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> sap-wug-bounces@mit.edu 
[mailto:sap-wug-bounces@mit.edu] <B>On Behalf Of </B>New 
Workflow<BR><B>Sent:</B> Monday, December 11, 2006 8:31 AM<BR><B>To:</B> 
sap-wug@mit.edu<BR><B>Subject:</B> Modify Standard Task<BR></FONT><BR></DIV>
<DIV></DIV>Hi,<BR><BR>Is it possible to modify the standard task (in my case 
7869) directly, or we need to first copy it a Z task.<BR><BR>Thanks in 
advance<BR>Prem<BR></BODY></HTML>